| Segment | Biopharmaceutical |
| Project | Refurbishment of oral, solid and liquid manufacturing areas |
| Built | 1996 - 2004 |
| CRs | ISO 5/7/8 |
| Total area | 3,500 m² |
| Town / City | San Agustín de Guadalix / Madrid |
| Country | Spain |
The different projects include: closures based on self-supporting and compact phenolic resin panels, floor and false ceilings; wiring for lighting; air treatment systems; modification of the pumping network and in some cases, air return; process fluids (deionised water, compressed air, cold/hot water); other services (fire prevention, drain networks, etc.) Certification.