| Segment | Biopharmaceutical |
| Project | Hormone plant |
| Built | 2006 |
| CRs | ISO 5/7/8 |
| Total area | 5,000 m² |
| Town / City | León / León |
| Country | Spain |
Air treatment installation for a new production area; weighing; stores; quality control laboratory; offices. The production area consists of 3 weighing zones with laminar flow, a manufacturing zone and a high containment packaging area. The installation consists of: air treatment (100% outside air); about 1,600 Kw cold production; filtering of pumped and removed air; dust trapping; automatic control by DDC system and wiring (boards and connections) for air treatment.