| Segment | Biopharmaceutical |
| Project | Refurbishment of oral, solid manufacturing areas. |
| Built | 2002 - 2003 |
| CRs | ISO 7/8 |
| Total area | 1,200 m² |
| Town / City | Carregado / Lisboa |
| Country | Portugal |
The installation includes: closures (paving, panels, false ceiling, SAS, air lock); conditioners; moisture scavengers and filtering; pipe and conduit networks; DDC control system; wiring for installations, lighting and process; dust trapping; IQ-OQ rating.