| Segment | Biopharmaceutical |
| Project | Medical chemistry (2002); conditioning third floor production and lozenge area (2003) |
| Built | 2002 - 2003 |
| CRs | ISO 8 |
| Total area | |
| Town / City | Sant Just Desvern / Barcelona |
| Country | Spain |
Air treatment system for classified rooms, special extractions and dust trapping; independent damping systems; laminar flows; cold water production equipment; hydraulic installation of hot and cold water and steam; wiring; monitoring and control system of thermo-climatic variables and pressure; start-up.