| Segment | Biopharmaceutical |
| Project | Research projects: Third floor building B (2002); second stage of R+D building and standard stable and SPF (2005); medical chemistry extension (2008) |
| Built | 2002 - 2009 |
| CRs | ISO 8 |
| Total area | |
| Town / City | Sant Feliu de Llobregat / Barcelona |
| Country | Spain |
Air treatment system for classified rooms, special extractions and dust trapping; independent damping systems; laminar flows; cold water production equipment; hydraulic installation of hot and cold water and steam; wiring; monitoring and control system of thermo-climatic variables and pressure; start-up.