| Segment | Biopharmaceutical |
| Project | Air treatment installation for several production buildings |
| Built | 1970 - 2009 |
| CRs | ISO 5/7/8 |
| Total area | |
| Town / City | Sant Andreu de la Barca / Barcelona |
| Country | Spain |
Projects: Installation of a sterile area (1973); quality control building with silo ventilation (1992); syrup area (1993); chemical development building (2001); Big Bag climate area and loading bay (2002); IMA 2 line (2003); chemical development laboratory and first floor of social building (2006); pilot plant in chemical plant and M3 area conditioning (2007); chemical plant (2008).
Air treatment system for classified rooms, special extractions and dust trapping; independent damping systems; laminar flows; cold water production equipment; hydraulic installation of hot and cold water and steam; wiring; monitoring and control system of thermo-climatic variables and pressure; start-up.